My New Student

Mary Ann has started building her second bamboo fly rod, so I now have two students in the shop working with me….keeps me pretty busy.  She is building a very nice progressive 7′  9″  4 wt rod, perfect for dry flies on spring creeks.  Here are a couple of photos from this past week.

Running strips through the Bellinger Beveller.

Checking the dimensions.

Building a Hollow-Built Bamboo Switch Rod – Chapter 3

I’ve been making good progress on my hollow-built bamboo switch rod.  The next step was making a custom winding check.  Bill Bennett at Bellingers made a few of these for me last year and has inspired me to build my own.  I machine small pieces of nickel/silver for the winding check, and then machine and polish black acrylic as the trim piece.  They look pretty nice on my switch rods.

Custom Machined Winding Checks

Custom Machined Winding Checks

Then it was time to blue the ferrules.  I use Brownells Oxpho-Blue liquid gun bluing solution on my nickel/silver ferrules.  First, the areas I don’t want blued get masked off with tape.  I then wipe a cotton swab drenched in the bluing solution over the ferrule, always making sure I move over the entire surface that I want blued.  It takes about 30 to 45 seconds at room temperature to get the desired effect.  Here is what it looks like:

Bluing a Nickel/Silver Ferrule.

Bluing a Nickel/Silver Ferrule.

It’s important to rinse the ferrule very well in running water to remove all the residual bluing solution.  Let it dry, and then spray the blued surface of the ferrule with a clear lacquer to protect it.  I use Rust-Oleum Painter’s Touch Crystal Clear Gloss in a spray can, but any good clear lacquer should work fine.  Then it was on to wrapping the guides.  As with all my switch rods, I use black thread with straw and claret tipping on my wraps.  I use Pearsall’s Naples thread on the ferrules, and Pearsall’s Gossamer thread on the snake guides.  The Stripping Guide is a 16 mm Black Banded Agate guilde.

Wrapping a Black Banded Agate Stripping Guide

Wrapping a Black Banded Agate Stripping Guide

Snake Guides on my Switch Rod.

Snake Guides on my Switch Rod.

Finally, after coating all the guide wraps with 8 coats of Varathane 900 Gloss, the rod was ready for finishing in my dipping tube process.  I put on 6 coats of polyurethane on my rods, using a dip tube filled with finish.  Each rod section is dipped into the finish and slowly pulled out.  The finish just runs off all the guides.   It takes about 2 hours to dip an entire rod.

The Butt Section coming out of the dip tube of finish.

The Butt Section coming out of the dip tube of finish.

It’s a slow process…kinda like watching paint dry!  After a day of drying time, each section gets a thorough sanding with 1500 grit sand paper, first the flats on the thread wraps, and then the flats on the bamboo.

Sanding the thread wraps after the fifth coat of finish.

Sanding the thread wraps after the fifth coat of finish.

Finally, after six dips and a final 48 hours of drying time, the finish gets rubbed out with a polishing compound.  I use Meguiars Mirror Glaze 83 as a polishing compound and a small felt pad.  This process helps take out any dust particles that have made their way onto the finish coat.

Polishing after the final finish dip.

Polishing after the final finish dip.

And that’s it.  After doing  a final fitting of the ferrules, the Hollow-Built Switch Rod is finished.

The finished Hollow-Built Switch Rod.

The finished Hollow-Built Switch Rod.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

And of course, I had to do a little casting down on the river this afternoon….

Casting a Hollow-Built Switch Rod.

Casting a Hollow-Built Switch Rod.

 

 

 

Building a Hollow-Built Bamboo Switch Rod – Chapter 1

I recently started on another Hollow-Built Bamboo Switch Rod.  I though it would be fun to document my process along the way, so here are some early photos.  First, the bamboo is selected and split.  For this Switch Rod, four pieces of matching bamboo were used.

Each piece of bamboo is split into 18 to 20 pieces.

Each piece of bamboo is split into 18 to 20 pieces.

Splitting into small strips.

Splitting into narrow strips.

The strips for the Butt Section and Mid Section are done.  The Tip sections still need to be split.

The strips for the Butt Section and Mid Section are done. The Tip sections still need to be split.

After heat treating, the bamboo strips are roughed out into a triangular shape on a Bellinger Beveler.

After heat treating, the bamboo strips are roughed out into a triangular shape on a Bellinger Beveler.

Hand Planing gets the strips down to the final tapered dimensions.

Hand Planing gets the strips down to the final tapered dimensions.

Each strip on the Butt and Mid Sections get hollowed with scalloped cuts on the inside edge.

Each strip on the Butt and Mid Sections get hollowed with scalloped cuts on the inside edge.

- The planed and hollowed bamboo strips are then glued together using Unibond 800 adhesive and a Bellinger Binder. The thread holds the strips together under a constant tension until the glue cures.

– The planed and hollowed bamboo strips are then glued together using Unibond 800 adhesive and a Bellinger Binder.
The thread holds the strips together under a constant tension until the glue cures.

 

 

 

 

 

 

 

 

 

 

Rod Building – Gluing Strips with the Bellinger Binder.

I’m working on a new rod right now and thought I would shoot a short video showing how the bamboo strips are glued together. I use a binder from Bellingers to accomplish this. Check it out! Oh, and by the way, how about my nice wallpaper in my rod finishing room. This room in my house was used as a boy’s bedroom by the previous homeowners. I have never felt the need to take it down.